Close

The District Collector inspected the student hostels under construction at an estimated cost of Rs.9.88 crore – 19.05.2023

Publish Date : 22/05/2023
The District Collector inspected the student hostels under construction at an estimated cost of Rs.9.88 crore - 19.05.2023
The District Collector, Tmt. K. Karpagam, I.A.S., inspected the hostels being constructed for the students to stay and study at an estimated cost of Rs. 9.88 crore in Veppanthattai Panchayat Union. (PDF 29KB)