District Collector inspected the construction of the bridge being built across the Maruthai River. – 12.11.2025
Publish Date : 14/11/2025
District Collector Tmt. N. Mirunalini, I.A.S., inspected the construction of two high-level bridges being built across the Maruthai River at an estimated cost of ₹10.09 crore in the Alathur Panchayat Union.(PDF 38KB)