The District Collector inspected construction work of high level bridge – 03.11.2023
Publish Date : 06/11/2023

The District Collector Tmt. K. Karpagam, I.A.S inspected constructing work of a high-level bridge on the Trichy-Chennai National Highway under the Perambalur district border and the place where the drivers’ rest area is to be constructed. (PDF 35KB)